Raised access floor cabling is where many data halls and comms rooms run their power and data. There is plenty of space under the tiles and the cables are out of sight. That is exactly the risk: cables laid without a plan block the cooling, make changes hard and become unmanageable within a few years. This guide covers the underfloor or overhead decision, a lane layout per aisle, fixing the basket, and what to watch for with airflow, bonding, fire and water.
What is a raised access floor?
A raised access floor is a grid of adjustable pedestals on the structural slab carrying removable panels, typically 600×600 mm. The floor itself is specified to BS EN 12825 [6]. In data centres the void is often 300 to 600 mm deep, more in large halls (rule of thumb, indicative). The void can do two jobs:
- Service void for power, data and pipework;
- Air plenum for cooling: cold air is pushed into the void and rises through perforated tiles in the cold aisle.
When it does both, cables compete with air. Even when the void is not a plenum, it is a service space with limited depth. Plan how many baskets may stack in each lane, and keep room for cooling pipework.
Underfloor or overhead: where should cables run?
| Factor | Under the floor | Overhead |
|---|---|---|
| Visibility | Tiles must be lifted | Everything visible |
| Effect on cooling | Cables obstruct air in a supply plenum | No effect on the floor void |
| Making changes | Tiles up, working on your knees | From steps or a tower |
| Space | Limited by void depth | Limited by soffit height |
| Typical use | Power, existing halls | Data and fibre, new halls |
Rule of thumb, indicative. The hall design decides.
A common combination is power under the floor and data overhead. The overhead route is covered in data centre cable management.
How should the floor void be laid out?
Run cables in fixed lanes parallel to the rack rows. A widely used layout:
| Zone | What runs there | Why |
|---|---|---|
| Under the cold aisle | Power, low on the slab | Low cables obstruct air to the perforated tiles least |
| Under the racks | Short branches to each rack | Shortest route to the PDU and patch panel |
| Under the hot aisle | Data baskets | No cold air comes up through the floor here |
Widely used layout, rule of thumb, indicative. The hall’s cooling concept governs.
Keep lanes at fixed distances from the rows so a fitter knows which panel to lift. Mark the lanes on the floor plan with panel grid references.
Let power and data lanes cross only at right angles and keep the BS EN 50174-2 separation [2]. Segregation is covered in power and data cable segregation.
How do you fix cable basket under the floor?
Cable basket is the usual choice under the floor: light, open and easy to cut around pedestals. Fix it in one of these ways:
- Stand-off supports on the slab. A common stand-off holds the basket 40 mm clear of the surface, in 180 and 350 mm lengths [3].
- Low strut frames on base plates, where the basket needs to sit higher or several baskets stack.
- Clamps on pedestals, only where the floor manufacturer allows it. Pedestals are designed for floor loads, and any extra load from containment needs the floor manufacturer’s approval.
An example height budget in a 600 mm void: 40 mm stand-off and a 55 mm deep basket put the top of the basket at 95 mm, leaving 505 mm open for air and other services.
More on fixing and joining basket in cable basket fixing.
How do you keep the airflow clear?
When the void is the plenum, every cable counts. Five measures:
- Keep the cable mass down. Run data overhead wherever you can.
- Fixed lanes. Lay cables in containment. Loose cables across the slab block the air.
- Remove redundant cables. Cables no longer in use take space and obstruct airflow.
- Seal the openings. Use brush grommets where cables leave the floor, so cold air does not escape.
- Watch the fill. Keep to the 40% rule of thumb under the floor as well (indicative). See cable tray fill calculation.
What mistakes come up most under the floor?
- Loose cables on the slab. Without containment, within a few years you have a tangle nobody dares touch.
- Redundant cables left in. They take space and block the air. Remove them with every change.
- Baskets under the perforated tiles. That is exactly where cold air needs to rise freely.
- Panels with large open cut-outs. Every open cut-out leaks cold air. Use brush grommets.
- No floor void drawing. Put the lanes on a plan so everyone follows the same layout.
What about bonding, fire and water?
- Bonding. Bond metal containment and the floor structure as required by BS 7671 [1]. Cable basket with the right couplers is electrically continuous to IEC 61537, and interruptions are bridged with a bonding connector [3][4].
- Fire. Cables in buildings carry a reaction-to-fire class under the Construction Products Regulation and BS EN 50575 [5]. The specification sets the class required under the floor. Seal penetrations through fire compartments with a tested firestop system.
- Water. Leave space under the containment for cleaning and for a leak detection cable. Never lay cables straight on the slab.
In the configurator you choose the data centre sector and the floor location in the environment step. You then build a low H-frame with cable basket, add the cables and get a bill of materials with supports, basket and cables.
Where do these figures come from?
- BS 7671, Requirements for Electrical Installations (IET Wiring Regulations).
- BS EN 50174-2, Information technology. Cabling installation. Installation planning and practices inside buildings.
- Eurostrut, wire basket accessory product pages: stand-off support (40 mm; 180 and 350 mm), bonding connector 12 and 16 mm². Accessed 19 November 2026. https://eurostrut.com/rejiband-afstandsteun-350mm-hdg/67030542
- IEC 61537 (BS EN 61537), Cable management. Cable tray systems and cable ladder systems.
- Construction Products Regulation and BS EN 50575, Power, control and communication cables. Cables for general applications in construction works subject to reaction to fire requirements.
- BS EN 12825, Raised access floors.
- Void depths, panel size and aisle layout: common practice (rule of thumb, indicative).
Frequently asked questions
How deep is a raised access floor in a data centre?
A finished floor void of 300 to 600 mm is common, sometimes more in large halls (rule of thumb, indicative). Depth follows the cooling design: a void that doubles as the air plenum needs more depth than one that only carries cables.
Should data cabling go under the floor or overhead?
Many new halls run data overhead and keep power under the floor. Cables in a supply plenum obstruct cold air and are harder to access. Overhead containment is visible, easy to extend and has no effect on underfloor airflow.
How do you fix cable basket under a raised floor?
On stand-off supports or low strut frames fixed to the slab, so the basket sits clear of the floor. A common stand-off support holds the basket 40 mm off the surface (manufacturer data). Only clamp to floor pedestals where the floor manufacturer allows it.
Why keep containment off the slab?
A gap under the basket allows cleaning, keeps standing water away from cables and leaves room for a leak detection cable. It also makes it easier to level the basket on a slab that is not perfectly flat.